|
The Fulmar Oilfield is situated 312 km east of Dundee, Scotland, United Kingdom in block number 30/16 and 30/11b. It is operated by Talisman Energy who took over from the previous operator, Shell at the end of 2006. At this time Talisman also purchased the equity of the other partners ExxonMobil and Amerada Hess. The field was discovered in December 1975 by well 30/16-6 in a water depth of 82 metres. Estimated ultimate recovery is 544 million barrels (86.5 m3) of oil. It is named after the fulmar, a sea bird. The oil reservoir is located at a depth of 3,050 metres. The "Fulmar A platform" operates above the oilfield. Production started in February 1982 from the Fulmar 'A' platform. This platform is a steel, 8 legged jacket designed by McDermott Engineering and constructed at Nigg, Easter Ross, Scotland. This jacket weighs 12,400 tonnes and supports a topside weight of around 22,560 tonnes. The topsides facilities included capability to drill, produce, meter, pump oil and gas. It can also inject both gas and water. Production is exported via the Norpipe system to Teesside. Associated natural gas from the reservoir is separated and used to power electrical generation with the excess being transported by the Fulmar Gas Pipeline to St. Fergus. Previously oil was exported by using an oil tanker anchored to the sea bed. The ''Medora'' Floating Storage Offloading (FSO) vessel broke free on the evening of 24 December 1988 narrowly missing the platform in the process. At that time Fulmar Alpha was host to a BBC crew who, not only, reported on the event but later delivered a live watchnight service broadcast from the platform in memory of the Piper Alpha disaster. Some of the same BBC crew having come directly from reporting on the Lockerbie disaster. ==See also== *Energy policy of the United Kingdom *Energy use and conservation in the United Kingdom 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Fulmar Oil Field」の詳細全文を読む スポンサード リンク
|